Working to the renowned unique MLC floor plate, the 868 square metre project incorporated open plan work spaces, private offices, a mix of informal meeting spaces and dedicated collaboration areas. A large staff kitchen and breakout area was a key design element for the DP World project, as the client needed a multipurpose space which is able to accommodate large town hall meetings, while further promoting social interaction between departments.

Client
DP World Australia
Location
Sydney CBD, NSW
Delivery Model
D&C
Floor Area
900 sqm
Construction Duration
10 weeks
“I’ve been involved in various fitouts over the years and I have to say that working with the Intermain team has been one of the best I’ve ever been involved in.
The project had last-minute challenges due to design changes however Intermain created, built and delivered, on time, a fantastic environment that is getting great feedback from the staff of all levels.”