Westmead Hospital was faced with the challenge of a growing private practice and limited space. They looked to Intermain for a fast and efficient solution.

Intermain were engaged to refurbish and reconfigure the existing private practice to allow for more consultation rooms. In addition to this, to provide more storage, Intermain manufactured and installed custom made joinery throughout the practice and reception.

Client
Westmead Hospital

Location
Westmead, NSW

Delivery Model
ECI

Floor Area
200 sqm

Construction Duration
5 weeks

Patients in mind

Intermain successfully delivered the project, giving Westmead Hospital more storage room for equipment and, most importantly, room for patients. Intermain executed the brief by designing the suite in a fashion which allowed room for future equipment to be installed, extra data and power included in all rooms, and an easily modified design.