Anton Real Estate | 157 Ann Street

Brisbane, QLD

Intermain were engaged for the building refurbishment of Anton Real Estate's asset at 157 Ann St, Brisbane, we worked in collaboration with client-side Project Managers APG and Designers, Cox Architecture

The scope of works focused on creating a stellar sense of arrival and the End of Trip Facilities (EOTF) as the primary strategy in appealing to prospective tenants. An additional portion of works was included for the make-good of Brisbane City Council BCC tenanted areas, stripping them back to base building following their lease expiry.

Client
Anton Real Estate

Location
157 Ann Street, Brisbane

Designer
Cox Architecture

Project Manager
APG

Delivery Model
D&C

Floor Area
16,300 sqm

Construction Duration
8 weeks

Experienced construction professionals

Our team of experienced construction professionals delivered the scope of works across two stages, stage 1; refurbishment of the existing lobby and entry, EOTF and facade replacement works, stage 2; make-good for the BCC lease expiry (2,655 sqm).

Successful delivery was defined by working in a live environment and ensuring that the building remained operational during construction, with minimum disruptions to tenants. Another critical area was increasing the offering to prospective tenants with cost-efficient upgrades; this meant utilising materials and building methods that were high in quality, yet had minimal ongoing maintenance and operational costs.

The result was a beautiful delivery, which elevated the buildings aesthetic of the building and added value to owners, current tenants and maximised appeal for future tenants.